#21. There are two 2 Gbps FC links, 2Gbps ISLs port formed into a single port channel connecting two switches together. What is the initial FSPF cost and resulting FSPF cost of the port channel if ISLs failed and one of the FC links becomes inoperable?
#22. What statement is NOT correct depending on the below output: MDS_switch#show iscsi virtual-target configured Target Seagate-jbod-lun *Port WWN 21:00.00.04:cf:db:3e:a7 Configured node No of LU mapping:1 ISCSI LUN :0x0000,FC LUN:0X0000 No of advertised interface: 1 GigabitEthernet 2/5 No of initiators permitted: 1 Initiator 10.48.69.241/32 is permitted All initiator permits is disabled
#28. Exhibit Assume that all the Cat6Ks in the exhibit above are connected to the MDS 9000 IPS blades and the workstation in the picture is connected to the same Cat6k etwork. Can the workstation act as a management station for the MDS 9000s?
#29. Exhibit button: The configured domain ID for VSAN 8 was changed from 0x30 to 0x97 and fcdomain was then restarted with the command, fcdomain restart disruptive vsan 8.VSAN 8 was then changed to interop mode 1. What statement is true?